Scale: 5kW/20kWh
● Charging services for electric vehicles.
● Local consumption of photovoltaic power generation.
● Off-grid operation is feasible.
Scale: 10kW/40kWh
● Local consumption of renewable energy.
● Lower energy bill with ToU electricity price.
● UPS.
● Off-grid operation is feasible.
Scale: 5kW/20kWh
● Charging services for electric vehicles.
● Off-grid operation is feasible.
● Lower energy bill with ToU electricity price.
● UPS.
Scale: 100kW/400kWh
● Lower energy bill with ToU electricity price.
● Reducing basic electricity fee.
● Dynamic expansion of transformer capacity.
● UPS.
Scale: 1MW/4MWh
● Local consumption of renewable energy.
● Lower energy bill with ToU electricity price.
● Reducing basic electricity fee.
● UPS, power quality improvement.
● Ancillary services in power system.
Scale: 0.5MW/5MWh
● Lower energy bill with ToU electricity price.
● Reducing basic electricity fee.
● Dynamic expansion of transformer capacity.
● UPS.
Scale: 50MW/200MWh
Unit module: 2.5MW/10MWh
● Ancillary services in power system.
● Electricity Spot Market.
● Lower energy bill with ToU electricity price.
● Grid structure optimization.
● Power quality improvement.
● Guarantee for power reliability.